Used5,328 mi.

2023 BMWM5 Base For Sale

$ 95,985
What's next?
Know before you go.

Pre-qualify with no impact to your credit score to see your real monthly payment and terms before visiting the dealer.

Assumes $1,000 Down Payment
Key features of this 2023 BMW M5 Base in Arlington, WA
GPS Navigation
Bluetooth
Rear View Camera
Blind Spot Monitor
Heated Seats
Leather Seats
Sunroof
Condition
USED
Mileage
5,328
MPG
15 City / 21 Hwy
Body Style
Sedan
Exterior Color
White
Interior Color
Black
Transmission
Automatic
Drive Train
AWD
Fuel Type
Gasoline
Engine
8 Cyl
Stock Number
PCN19407
VIN
WBS83CH02PCN19407
What's next?
vehicle

Love the car, see the car.

Contact the dealer to see if the car is still available and schedule a test drive.

Buy your next car with confidence.
The CARFAX Report provides you with access to information like prior accidents and damage, number of owners, service records and mileage.
Consumer Ratings and Reviews of the 
BMW M5 
Base
from KBB.com

4.5

★★★★★

Overall Consumer Rating

Comfort

4.4 out of 5

Performance

4.4 out of 5

Quality

4.4 out of 5

Reliability

4.4 out of 5

Styling

4.3 out of 5

Value

4.4 out of 5

Based on 17 consumer ratings for the 2018 - 2023 models as of 01/19/2025.

5.0 out of 5 stars
★★★★★

Like driving God's car

01/29/2019

I traded my 2017 Challenger Hellcat in on this M5. The M5 pulls just as hard but with all wheel drive it is so much more controlled. The rear end tried to help steer the Hellcat so you better be pointed in the right direction. The M5's fit and finish and interior materials are so perfect. The stereo in the M5 is incredible. The M5 has four doors so you can put people and groceries in the back seat and not just your racing helmet.
5.0 out of 5 stars
★★★★★

The Beast!

07/14/2021

This is the most fun I've had behind the wheel of a full size 4 door passenger car. It's head-snapping quick, handles like a race car and has all the comfort features expected from a BMW. Please keep on making these angry V8 beasts that rumble through the neighborhood to show that there's no substitute for horsepower and those silent electric rides are just a pedestrian accident waiting to happen. Raw exhaust noise on tap here.
5.0 out of 5 stars
★★★★★

Head turner & love of my life

06/02/2021

Three years after owning this car, I still get a huge smile on my face every time I drive this car. The acceleration, handling, and road feel are sublime, invigorating, yet very luxurious. I took my M5 on a 30 day 10k mile road trip of a lifetime, and the seating was comfortable even after 8+ hours on the road. I get thumbs up daily, it’s never let me down mechanically, and I highly recommend that everyone own this car at least once in their lifetime. It’s made my life happier and better, I named it Dream, and that’s exactly what it’s been to me since the day I bought it.
Dealership Photo

Open Today 10:00 AM - 6:00 PM